Riveted the web stiffeners to the main bulkhead webs.
Riveted the nut plates to the root faring angles and lower skin. Then riveted the root faring angles to the left side skin
Bolted the left bulkhead bar back in placed and torqued it down.
Removed the right landing gear bracket in preparation for riveting the right side skin to the fuselage.
In other exciting news, my engine arrived from Lycoming!
Today’s Time (hours): | 5.0 |
Fuselage Time (hours): | 123.0 |
Total Time (hours): | 577.5 |