Continued assembling the firewall

Riveted the angles and lower gusset to the right firewall side. Used tank sealant to Seal the top of the firewall to the sides and clecoed in place along with the top firewall angle and riveted them together. Clecoed the tunnel sides to the firewall assembly. Sealed the firewall center to the sides and top and clecoed in place. Clecoed the upper top angle and gussets in place. Final drilled the nose gear brackets.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 61.5
Total Time (hours): 516.0

 

Riveted the angles to the left firewall side

Received the new firewall angles from Van’s. Deburred, scuffed, and primed them. Then taped the holes I shouldn’t countersink and countersunk the rest.

img_3420

 

Clecoed the angles and gussets to the firewall. Then back-riveted the left firewall side.

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 59.5
Total Time (hours): 514.0

 

Deburred, Scuffed, and Primed Forward fuse.

Did the deburring and scuffing last night. Neglected to take any pictures. Shot the primer this evening. My firewall parts order showed up so included those as well.

img_3417

 

Today’s Time (hours): 2.0
Fuselage Time (hours): 57.5
Total Time (hours): 512.0