Began Work on Forward Fuselage Lower Structure (Section 28) Picked, inspected, and peeled all the part. Cut apart all the parts that needed to be separated. Today’s Time (hours): 2.0 Fuselage Time (hours): 55.5 Total Time (hours): 510.0 Share this:TwitterFacebookLike this:Like Loading... Related