Primed the Firewall parts and started assembly

Primed all the aluminum firewall parts.

img_3398

 

Machine countersunk the firewall angles and riveted on the support angle.

 

 

Dimpled the tunnel sides and riveted the nutplates to the top flanges. Dimpled the cover angle brackets and riveted nutplates to the top flanges. Then riveted the brackets to the tunnel sides. Riveted the nose gear brackets and firewall angles to the tunnel sides.

 

 

Today’s Time (hours): 3.0
Fuselage Time (hours): 51.5
Total Time (hours): 506.0

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s