Primed all the aluminum firewall parts.
Machine countersunk the firewall angles and riveted on the support angle.
Dimpled the tunnel sides and riveted the nutplates to the top flanges. Dimpled the cover angle brackets and riveted nutplates to the top flanges. Then riveted the brackets to the tunnel sides. Riveted the nose gear brackets and firewall angles to the tunnel sides.
Today’s Time (hours): | 3.0 |
Fuselage Time (hours): | 51.5 |
Total Time (hours): | 506.0 |