Peeled, cut, and deburred all the firewall parts Peeled all the parts. Cut apart the parts that needed to be separated. Deburred all the edges. Today’s Time (hours): 2.0 Fuselage Time (hours): 48.0 Total Time (hours): 502.5 Share this:TwitterFacebookLike this:Like Loading... Related