Primed all of the parts.
Dimpled the bulkhead and side channels.
Riveted the doubles to the bulkhead.
Riveted the side channels and doublers to the bulkhead. Unfortunately I didn’t see the note in the instructions indicating that the manufactured heads should be on the aft side until after I had driven all the rivets. So I got to drill them all out and do them again. Yay.
All’s well that ends well.
Today’s Time (hours): | 3.0 |
Fuselage Time (hours): | 6.0 |
Total Time (hours): | 460.5 |