Riveted the top side skins

Clecoed and bolted the vertical stabilizer to the aft fuselage and match drilled the upper attachment holes.

IMG_2015

 

Rolled the aft fuselage on its side to rivet the top side skins.

IMG_2017

 

Finished riveting both top side skins to the aft fuselage.

IMG_2019

 

Clecoed the top skin in place.

IMG_2021

 

Tomorrow I’ll rivet the top skin and that will complete the aft fuselage.

 

Today’s Time (hours): 3.0
Empennage Time (hours): 183.0
Total Time (hours): 183.0

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s