Clecoed and bolted the vertical stabilizer to the aft fuselage and match drilled the upper attachment holes.
Rolled the aft fuselage on its side to rivet the top side skins.
Finished riveting both top side skins to the aft fuselage.
Clecoed the top skin in place.
Tomorrow I’ll rivet the top skin and that will complete the aft fuselage.
Today’s Time (hours): | 3.0 |
Empennage Time (hours): | 183.0 |
Total Time (hours): | 183.0 |