Primed Tail Cone Parts

I peeled the blue vinyl from the j channel that’s formed into the edges of the bottom skin so that I could scuff and prime those along with the inside of the skin.

IMG_1923

First batch of four ready to shoot.

IMG_1924

Second batch was the rest of the bulkheads and bell crank ribs (not pictured) and the third batch included the longerons and stiffeners. The last batch was the bottom skin.

IMG_1925

Et viola!

IMG_1926

Tomorrow I’ll begin assembling the tail cone. Once I get the substructure assembled and riveted to the bottom skin, I’ll have one more big scuff and prime session for the skins and the few remaining substructure components.

Today’s Time (hours): 3.0
Empennage Time (hours): 147.0
Total Time (hours): 147.0

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s