I got home from a grocery run with the family and my replacement trailing edge was waiting in the driveway. Thank you, Van’s. Their shipping team is not taking any chances. The trailing edge was wrapped in paper, and sealed in a length of PVC pipe with PVC end caps. The end caps were sealed with that tape they use for packing everything. This is the stickiest tape ever. I’m thinking I might build a plane from it after the RV is done.
I was just going to bring it down to the shop. But once I saw the packing job, I just had to open it. …and since I was down there and the drill press was still set up for countersinking trailing edge, I clecoed it to the skin, marked it, trimmed it, and finished the outboard end correctly this time. And then I countersunk it.
…and while I’m down here, I might as well prep the skins for bonding, too. Same drill as the trim tab… Measure, tape, strip primer with isopropyl, sand, and wipe with acetone.
Ready to start assembling the elevators!
Happy New Year!
Today’s Time (hours): | 2.0 |
Empennage Time (hours): | 103.5 |
Total Time (hours): | 103.5 |